DESCRIPTION There may be a
short circuit between one of the CAN bus lines and GND when there is no
resistance between terminal 18 (CA4H) of the central gateway ECU
(network gateway ECU) and terminal 4 (CG) of the DLC3, or terminal 17
(CA4L) of the central gateway ECU (network gateway ECU) and terminal 4
(CG) of the DLC3.
Symptom | Trouble Area |
There
is no resistance between terminal 18 (CA4H) of the central gateway ECU
(network gateway ECU) and terminal 4 (CG) of the DLC3, or terminal 17
(CA4L) of the central gateway ECU (network gateway ECU) and terminal 4
(CG) of the DLC3. |
- Short to ground in CAN main bus line
- Central gateway ECU (network gateway ECU)
- ECM
- No. 2 CAN junction connector
- No. 4 CAN junction connector
| WIRING DIAGRAM
CAUTION / NOTICE / HINT
CAUTION: When performing the confirmation driving pattern, obey all speed limits and traffic laws.
NOTICE:
HINT:
- Before disconnecting related connectors for inspection, push in on each
connector body to check that the connector is not loose or disconnected.
- When a connector is disconnected, check that the terminals and connector body are not cracked, deformed or corroded.
PROCEDURE
1. | CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 2 CAN JUNCTION CONNECTOR) |
(a) Disconnect the cable from the negative (-) battery terminal. (b) Disconnect the A49 No. 2 CAN junction connector.
(c) Measure the resistance according to the value(s) in the table below.
*1 | DLC3 |
- | - |
*a | Front view of wire harness connector
(to No. 2 CAN Junction Connector) |
*b | to No. 4 CAN Junction Connector |
*c | to ECM |
- | - |
Standard Resistance:
Tester Connection | Condition |
Specified Condition | Connected to |
A49-10 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
No. 4 CAN junction connector |
A49-21 (CANL) - G45-4 (CG) |
A49-11 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
ECM | A49-22 (CANL) - G45-4 (CG) |
Result | Proceed to |
OK | A |
NG (Line to ECM) | B |
NG (Line to No. 4 CAN junction connector) |
C |
A |
| REPLACE NO. 2 CAN JUNCTION CONNECTOR |
C |
| GO TO STEP 3 |
B |
| |
2. |
CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 2 CAN JUNCTION CONNECTOR - ECM) |
(a) Disconnect the A18 ECM connector. (b) Measure the resistance according to the value(s) in the table below.
*1 | DLC3 |
- | - |
*a | Front view of wire harness connector
(to No. 2 CAN Junction Connector) |
*b | to ECM |
Standard Resistance:
Tester Connection | Condition |
Specified Condition |
A49-11 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
A49-22 (CANL) - G45-4 (CG) |
Result | Proceed to |
OK | A |
NG | B |
A |
| REPLACE ECM |
B |
| REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 2 CAN JUNCTION CONNECTOR - ECM) |
3. |
CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR - NO. 2 CAN JUNCTION CONNECTOR) |
(a) Disconnect the G96 No. 4 CAN junction connector. (b) Measure the resistance according to the value(s) in the table below.
*1 | DLC3 |
- | - |
*a | Front view of wire harness connector
(to No. 4 CAN Junction Connector) |
*b | to No. 2 CAN Junction Connector |
Standard Resistance:
Tester Connection | Condition |
Specified Condition |
G96-11 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
G96-22 (CANL) - G45-4 (CG) |
NG |
| REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 4 CAN JUNCTION CONNECTOR - NO. 2 CAN JUNCTION CONNECTOR) |
OK |
| |
4. |
CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR) |
(a) Disconnect the G95 No. 4 CAN junction connector. (b) Measure the resistance according to the value(s) in the table below.
*1 | DLC3 |
- | - |
*a | Front view of wire harness connector
(to No. 4 CAN Junction Connector) |
*b | to Central Gateway ECU (Network Gateway ECU) |
Standard Resistance:
Tester Connection | Condition |
Specified Condition |
G95-1 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
G95-12 (CANL) - G45-4 (CG) |
OK |
| REPLACE NO. 4 CAN JUNCTION CONNECTOR |
NG |
| |
5. |
CHECK FOR SHORT TO GND IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)) |
(a) Disconnect the G52 central gateway ECU (network gateway ECU) connector.
(b) Measure the resistance according to the value(s) in the table below.
*1 | DLC3 |
- | - |
*a | Front view of wire harness connector
(to No. 4 CAN Junction Connector) |
*b | to Central Gateway ECU (Network Gateway ECU) |
Standard Resistance:
Tester Connection | Condition |
Specified Condition |
G95-1 (CANH) - G45-4 (CG) |
Cable disconnected from negative (-) battery terminal |
200 Ω or higher |
G95-12 (CANL) - G45-4 (CG) |
OK |
| REPLACE CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) |
NG |
| REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 4 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)) | |