INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the 2 bolts. Torque: 43 N·m {438 kgf·cm, 32 ft·lbf}
(c) Install the wire harness clamp bracket with the 2 bolts. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} (d) Engage the 3 wire harness clamps. (e) Connect the camshaft timing oil control solenoid assembly connector. (f) Connect the compressor assembly with magnetic clutch connector. (g) Connect the generator assembly connector. (h) Connect the wire harness to terminal B with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (i) Close the terminal cap. 2. INSTALL V-RIBBED BELT Click here 3. INSTALL V-BANK COVER SUB-ASSEMBLY Click here 4. INSTALL RADIATOR ASSEMBLY Click here 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here |
Toyota Avalon (XX50) 2019-2022 Service & Repair Manual > Safety Connect System(for Hv Model): Precaution
PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE AUXILIARY BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) auxiliary battery terminal, initialize the following systems after the cable is reconnected. System Name See Procedure Lane Departure Alert System (w/ Ste ...