INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the 2 bolts. Torque: 43 N·m {438 kgf·cm, 32 ft·lbf}
(c) Install the wire harness clamp bracket with the 2 bolts. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} (d) Engage the 3 wire harness clamps. (e) Connect the camshaft timing oil control solenoid assembly connector. (f) Connect the compressor assembly with magnetic clutch connector. (g) Connect the generator assembly connector. (h) Connect the wire harness to terminal B with the nut. Torque: 9.8 N·m {100 kgf·cm, 87 in·lbf} (i) Close the terminal cap. 2. INSTALL V-RIBBED BELT Click here 3. INSTALL V-BANK COVER SUB-ASSEMBLY Click here 4. INSTALL RADIATOR ASSEMBLY Click here 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Click here |
Toyota Avalon (XX50) 2019-2022 Service & Repair Manual > Fuel System: System Diagram
SYSTEM DIAGRAM FUEL FLOW DIAGRAM *A for Direct Injection - - *1 Fuel Injector Assembly *2 Throttle Body with Motor Assembly *3 Fuel Pressure Sensor (Fuel Delivery Pipe with Sensor Assembly LH) (for High Pressure) *4 Fuel Pressure Pulsation Damper Assembly *5 Plunger *6 Fuel Pump Assembly (for High P ...